Abstract

This paper presents a precast concrete solution developed for the construction of pipe rack structures in petrochemical plants. It is based on the prefabrication of concrete columns and beams connected on-site by a wet joint. The solution is characterized by high strength and ductile behavior in the plastic range, and ease of in-plant fabrication and on-site assembly. Experimental tests conducted on reduced-scale structures verified that the behavior of the prefabricated solution during an earthquake is comparable to, if not better than, that of the corresponding cast-in-place concrete solution awhile fulfilling the requirement of the American Concrete Institute’s (ACI’s) Acceptance Criteria for Moment Frames Based on Structural Testing (ACI 374.1-05). The proposed precast concrete solution economically mimics the behavior of monolithic reinforced concrete frames. A case study of several pipe rack structures in a remote seismic zone has been presented to underscore the benefits achievable with this technique in terms of duration and safety of the construction process.

References

Vaquero, S. F., D. R. Correa, and S. F. Wolkomirski. 2013. “Precast Concrete, Steel-Braced, Hybrid Pipe Rack Structures.” PCI Journal 58 (4): 55–67.

Priestley, M. 1991. “Overview of PRESSS Research Program.” PCI Journal 36 (4): 50–57.

Priestley, M., S. Sritharan, J. Conley, and S. Pampanin. 1991. “Preliminary Results and Conclusions from the PRESSS Five-Story Precast Concrete Test Building.” PCI Journal 44 (6): 42–67.

Restrepo, J. I., R. Park, and A. H. Buchanan. 1995. “Test on Connections of Earthquake Resisting Precast Reinforced Concrete Perimeter Frames of Buildings.” PCI Journal 40 (4): 44–61.

Priestley, M., and G. MacRae. 1996. “Seismic Tests of Precast Beam-to-Column Joint Subassemblages with Unbonded Tendons.” PCI Journal 41 (1): 64–80.

Alcocer, S., R. Carranza, D. Perez-Navarrete, and R. Martinez. 2002. “Seismic Tests of Beam-to-Column Connections in a Precast Concrete Frame.” PCI Journal 47 (3): 70–89.

Korkmaz, H. H., and T. Tankut. 2005. “Performance of a Precast Concrete Beam-to-Beam Connection Subject to Reversed Cyclic Loading.” Engineering Structures 27 (9): 1392–1407.

Ong, K., Z. S. Lin, L. R. Chandra, C. T. Tam, and S. D. Pang. 2013. “Experimental Investigation of a DfD Moment-Resisting Beam-Column Connection.” Engineering Structures 56: 1676–1683.

Parastesh, H., I. Hajirasouliha, and R. Ramezani. 2014. “A New Ductile Moment-Resisting Connection for Precast Concrete Frames in Seismic Regions: An Experimental Investigation.” Engineering Structures 70: 144–157.

Bournas, D., P. Negro, F. Molina, B. Viaccoz, and G. Magonette. 2012. Pseudodynamic Testing of the SAFECAST 3-Storey Precast Concrete Building. JRC (Joint Research Centre) technical report. Luxembourg: European Commission JRC.

Vidjeapriya, R., and K. Jaya. 2013. “Experimental Study on Two Simple Mechanical Precast Beam-Column Connections under Reverse Cyclic Loading.” Journal of Performance of Constructed Facilities 27 (4): 402–414.

Naaman, A. E., J. K. Wight, and H. Abdou. 1987. “SIFCON Connections for Seismic Resistant Frames.” Concrete International 9 (11): 34–39.

Vasconez, R., A. Naaman, and J. Wight. “Behavior of HPFRC Connections for Precast Concrete Frames under Reversed Cyclic Loading.” PCI Journal 43 (6): 58–71.

Maya, L., C. Zanuy, L. Albajar, C. Lopez, and J. Portabella. “Experimental Assessment of Connections for Precast Concrete Frames Using Ultra High Performance Fibre Reinforced Concrete.” Construction and Building Materials 48: 173–186.

Choi, H.-K., Y.-C. Choi, and C.-S. Choi. 2013. “Development and Testing of Precast Concrete Beam-to-Column Connections.” Engineering Structures 56: 1820–1835.

Cheok, G., W. Stone, and S. Kunnath. 1998. “Seismic Response of Precast Concrete Frames with Hybrid Connections.” ACI Structural Journal 95 (5): 527–538.

Breccolotti, M., S. Gentile, M. Tommasini, A. L. Materazzi, M. F. Bonfigli, B. Pasqualini, V. Colone, and M. Gianesini. 2016. “Beam-Column Joints in Continuous RC Frames: Comparison between Cast-in-Situ and Precast Solutions.” Engineering Structures 127: 129–144.

ACI (American Concrete Institute) Committee 318. 2008. Building Code Requirements for Structural Concrete (ACI 318-08) and Commentary (ACI 318R-08). Farmington Hills, MI: ACI.

Comisión Federal de Electricidad. 2008. Manual de Diseño de Obras Civiles: Diseño por Sismo. Mexico: Comisión Federal de Electricidad.

Administración Pública del Distrito Federal. 2004. “Normas Técnicas Complementarias para Diseño y Construcción de Estructuras de Concreto.” Gaceta Oficial del Distrito Federal I (103-bis): 88–194.

ACI Committee 374. 2001. Acceptance Criteria for Moment Frames Based on Structural Testing and Commentary. (ACI 374.1-05). Farmington Hills, MI: ACI.

International Code Council. 2009. International Building Code 2009. Whittier, CA: International Conference of Building Officials.

ASCE (American Society of Civil Engineers). 2010. Minimum Design Loads for Buildings and Other Structures. ASCE/SEI 7-10. Reston, VA: ASCE.

Building Seismic Safety Council. 2004. NEHRP Recommended Provisions for Seismic Regulations for New Buildings and Other Structures, Part 1: Provisions and Part 2: Commentary (FEMA 450). Washington, DC: FEMA (Federal Emergency Management Agency).