Abstract

The Washington State Department of Transportation (WSDOT) is updating its design methodology and detailing practices to facilitate optimized fabrication of precast, pretensioned concrete bridge girders. The objectives are reducing cost by saving on materials and labor, improving schedules by optimizing plant usage and production efficiencies, and enhancing quality by avoiding interferences and tight tolerances. Primary among these optimization techniques is the design and detailing of the permanent pretensioned strand configuration. This paper presents a step-by-step design procedure and example problem that optimizes the pretensioning configuration for maximum production efficiency while maintaining compliance with the applicable requirements for safe handling and shipping. The procedure provides the manufacturer with a high degree of flexibility in plant usage and production turnover. Other optimization techniques, while important, are not covered in this paper.

References

1. Seguirant, S. J. 1998. New Deep WSDOT Standard Sections Extend Spans of Prestressed Concrete Girders. PCI Journal, V. 43, No. 4 (July–August): pp. 92–119.

2. Brice, R., B. Khaleghi, and S. J. Seguirant. 2007. Design of Precast-Prestressed Concrete Girders for Optimized Fabrication. In The PCI National Bridge Conference: Proceedings, October 22–24,  2007, Phoenix, Arizona. CD-ROM.

3. Washington State Department of Transportation (WSDOT). 2008. Bridge Design Manual. M23-50. Olympia, WA: WSDOT.

4. WSDOT. 2006. Standard Specifications for Road, Bridge and Municipal Construction. M 41-10. Olympia, WA: WSDOT.

5. Mast, R. F. 1989. Lateral Stability of Long Prestressed Concrete Beams: Part 1. PCI Journal, V. 34, No. 1 (January–February): pp. 34–53.

6. Mast, R. F. 1993. Lateral Stability of Long Prestressed Concrete Beams: Part 2. PCI Journal, V. 38, No. 1 (January–February): pp. 70–88.

7. American Association of State Highway and Transportation Officials (AASHTO). 2007. AASHTO LRFD Bridge Design Specifications. 4th ed. Washington, DC: AASHTO.

8. PCI Committee on Prestress Losses. 1975. Recommendations for Estimating Prestress Losses. PCI Journal, V. 20, No. 4 (July–August): pp. 43–75.

9. Tadros, M. K., N. Al-Omaishi, S. J. Seguirant, and J. G. Gallt. 2003. Prestress Losses in Pretensioned High-Strength Concrete Bridge Girders. National Cooperative Highway Research Program report   96, Transportation Research Board, Washington, DC.

10. Dolan, C. W., and J. J. Krohn. 2007. A Case for Increasing the Allowable Compressive Release Stress for Prestressed Concrete. PCI Journal, V. 52, No. 1 (January–February): pp. 102–105.