PCI is directly supporting six building code change proposals for the 2009 IBC code development cycle.

Below is a brief explanation of each code change proposal which is attached


Code Updates - Download


6 Files Total  

Proposal Section 421 and Proposal Section 1614 deal with creating new structural integrity provisions as a result of NIST’s WTC investigations.
Proposal_Section_421.pdf (118.3 KB PDF FILE)
Proposal_Section_1614.pdf (118.3 KB PDF FILE)

Proposal Section 406_3_6 deals with clarifying the height dimension in the calculation of interior area of an open parking structure.
Proposal_Section_406_3_6.pdf (103.5 KB PDF FILE)

Proposal Section 713_1 deals with adding a provision that includes enclosed parking garages as a location where fire-resistant joint systems are not required.
Proposal_Section_713_1.pdf (101.4 KB PDF FILE)

Proposal Section 1613_6_3 deals with adding provisions for ordinary braced frames of reinforced concrete to be used as lateral-force-resisting systems in earthquake design.
Proposal_Section_1613_6_3.pdf (132.5 KB PDF FILE)

Proposal Section 2603_5_5 deals with creating an exception for precast concrete sandwich wall panels to a fire test standard. This provision currently requires all wall assemblies containing foam plastic insulation (including all precast insulated panels) in a multi-story building to be fire tested.
Proposal_Section_1613_6_3.pdf (101.9 KB PDF FILE)

Hosted by InterActive Twist a division of Leader Graphic Design, Inc.